Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Augenbroe, G, Verheij, H and Schwarzmuller, G (2002) Project web sites with design management extensions. Engineering, Construction and Architectural Management, 9(03), 259–71.

Austin, S A, Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(03), 249–58.

Ballard, G (2002) Managing work flow on design projects: a case study. Engineering, Construction and Architectural Management, 9(03), 284–91.

Heintz, J L (2002) Collaborative design planning networks. Engineering, Construction and Architectural Management, 9(03), 181–91.

Johnson, R, Clayton, M, Xia, G E, Woo, J-H and Song, Y (2002) The strategic implications of e-commerce for the design and construction industry. Engineering, Construction and Architectural Management, 9(03), 241–8.

Lockley, S R, Watson, R and Shaaban, S (2002) Managing e-commerce in construction - revolution or e-business as usual?. Engineering, Construction and Architectural Management, 9(03), 232–40.

Macmillan, S, Steele, J, Kirby, P, Spence, R and Austin, S A (2002) Mapping the design process during the conceptual phase of building projects. Engineering, Construction and Architectural Management, 9(03), 174–80.

Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(03), 222–31.

Otter, A F d and Prins, M (2002) Architectural design management within the digital design team. Engineering, Construction and Architectural Management, 9(03), 162–73.

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(03), 209–21.

  • Type: Journal Article
  • Keywords: business process management; collaborative building design; distributed process management; project management; teamwork
  • ISBN/ISSN: 0969-9988
  • URL: http://www.ingentaconnect.com/search/expand?pub=infobike://bsc/ecam/2002/00000009/00000003/art00006&unc=
  • Abstract:
    This paper presents a research study conducted for evaluating the effectiveness of a conceptual model of a distributed process management environment in the establishment of a collaborative building design. At the highest level, the conceptual model of the distributed process management environment have the following features: (a) enables description of a plan of a design process, (b) enables enactment of a process according to its plan, and (c) enables control and management of the enactment of a design process. The paper also presents the findings of a verification and validation (V & V) study conducted for evaluating the fit between the needs and expectations of collaborating design groups and the solution provided by the conceptual model of the distributed process management environment.

Watson, R, Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data - managing electronic project specification information. Engineering, Construction and Architectural Management, 9(03), 272–83.

Wilde, P D, Augenbroe, G and Voorden, M V D (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(03), 192–208.